text.skipToContent text.skipToNavigation

CRL Brushed Stainless Steel Meridian Series Glass Mount Bracket

Finish/Color : Brushed Stainless Steel
Brushed Stainless Steel
Item #: HR4GBS
View Prices with a Purchase Account
Minimum Order Quantity : 1
Unit of Measure : each

Shipping Weight : 1.79 Pounds
Shipping Limitations : None
Compliance and Restrictions
Warning Reproductive Harm - www.p65warnings.ca.gov
CRL Brushed Stainless Steel Meridian Series Glass Mount Bracket
×
CRL Brushed Stainless Steel Meridian Series Glass Mount Bracket
Quantity Standard Price Sale Price Your Price
CRL Brushed Stainless Steel Meridian Series Glass Mount Bracket Stock
Branch Location STOCK AVAILABILITY
Los Angeles, California 76
Dallas, Texas 6/27/2025
Chicago (Elgin), Illinois 6/27/2025
San Francisco/Oakland (Union City), California 6/26/2025
Atlanta, Georgia 1
New York Area (Secaucus, New Jersey) 6/30/2025
Boston (Taunton), Massachusetts 6/30/2025
Orlando, Florida 7/1/2025
Denver, Colorado 7/1/2025
Seattle (Kent), Washington 7/1/2025
Cleveland (Solon), Ohio 6/30/2025
Philadelphia Area (Moorestown, New Jersey) 6/27/2025
Phoenix, Arizona 6/26/2025
Las Vegas, Nevada 1
Houston, Texas 6/27/2025
Miami, Florida 7/2/2025
San Diego, California 6/25/2025
Carolinas and Virginia, South Carolina 6/30/2025
Product Details
  • Centerline Width Projection
    3-2/8 in. (83 mm)
  • Finish/Color:
    Brushed Stainless Steel
  • Material
    Stainless Steel
Product Overview
  • Ready-to-Install
  • Two Architectural Finishes Available
  • For 1-1/2" to 2" (38 and 50.8 mm) Diameter Hand Rail Tubing

This CRL Glass Mounted Hand Rail Bracket is available in two architectural finishes for 1-1/2" to 2" (38 or 50.8 mm) diameter Hand Rail tubing. Brackets are individually packed and come with an outside disc for glass mounting. Requires 3/4" hole in glass.

Most shipping weights are approximate and have not been verified. If the exact weight is needed in order to determine shipping costs, and shipping costs are required in order for you to complete your order, please request this prior to submitting your order by contacting CRL Customer Service. Product images shown are of the actual product or a close representation. Colors can vary depending on your computer's video card and on how your monitor's color is adjusted.

Stainless Steel Advisory:
Although Stainless Steel is resistant to corrosion, it is not rust or stain proof. CRL recommends periodic maintenance to help maintain its factory finish. For more information, view the Stainless Steel Disclaimer found in the Technical References section below.
Technical References & CAD Drawings